Connect with us

Hi, what are you looking for?

Investing

Nightflower Exploration Target Upgrade Following Antimony Price Increase

Tartana Minerals Limited (ASX: TAT) (the Company), is pleased to advise that it has upgraded its Nightflower Exploration Target after reviewing its earlier estimation in light of the recent increases in the Antimony price. Nightflower is a high grade silver – lead deposit with, previously overlooked, significant Antimony credits.

Highlights:

Nightflower project is a high grade silver deposit with historically impressive intersections from past drilling including 9 m @ 506g/t Silver (>16 oz/t), 12.6% Lead, and 1.46% Zinc.1An Exploration Target range reported on 6 June 2022 has now been substantially upgraded to 2.75 Mt @ 364 g/t Ag Eq for 32 Moz Ag Eq to 5.36 Mt @ 270 g/t Ag Eq for 47 Moz Ag Eq. The Exploration Target is conceptual in nature only and there is no guarantee that further exploration will define a resource.Antimony has contributed to the Exploration Target, however, recent significant increases in the Antimony price due to China’s export restrictions have improved the project’s economics.Historical drilling results indicate Antimony grades up 3.05m @ 9.0% Sb, 24.0% Pb, 10.5% Zn, 14.9 oz/t Ag, and 0.38% Cu (Hole NF72DD11), although the Exploration Target is based on a 1% Sb grade.Drilling is now being planned to test the target and upgrade previously identified mineralisation to JORC 2012 reporting standards.

In mid-August China, the world’s largest producer of Antimony – producing 83,000t in 2023 (USGS) – accounting for 48% of the world’s supply, will be restricting Antimony exports from 21 September 2024. Consequently, the Antimony price has significantly increased and is currently trading at US$24,500/tonne (Argus Metals, Antimony ingot min 99.65% fob China).

The revised Exploration Target is summarised in Figure 1, incorporating the original tonnages from the 6 June 2022 announcement with revisions to the grade range, detailed later in this report.

The estimated Antimony content range within the Exploration Target is summarized in Figure 2 below.

Tartana Minerals Managing Director, Stephen Bartrop, commented:

“Significant increases in our Exploration Target, Antimony prices, and consequently the economics of the project underpins the importance of the Nightflower project. With production at the Tartana mine site reaching steady state, this opportunity is only more significant. Further this represents only one target (The Digger Lode mineralisation) and excludes the prospectivity of the adjacent Terrace lode and a possible further discovery.”

Nightflower Silver Project History

The Nightflower project is located 40 km north of Chillagoe in Far North Queensland. It covers a substantial part of the northern Featherbed Volcanic Group and the underlying and surrounding Hodgkinson Formation.

It was discovered as a high grade silver deposit in 1923 and was visited by the Queensland Premier in October 1923. On the Premier’s return to Brisbane he reported that the ore at Nightflower was very rich and a truck-load treated at Chillagoe gave about 30% of lead and 40 ounces of silver to the ton (Source: Qld Govt Mining Journal Vol XXIV, Oct 1923).

Click here for the Corporate Presentation & Webinar

Click here for the full ASX Release

This post appeared first on investingnews.com
Click to comment

Leave a Reply

Your email address will not be published. Required fields are marked *

You May Also Like

Investing

Battery metals like graphite are becoming increasingly important for their role in battery technologies. Both synthetic and natural graphite, in the form of spherical...

Investing

2023 was volatile for zinc — as the bottom fell out of the market, it approached its lowest point since July 2020. As 2024...

Politics

Typhoon Yagi, Asia’s most powerful storm this year, was downgraded to a tropical depression on Sunday, after wreaking havoc in northern Vietnam, China’s Hainan...

Investing

Los Andes Copper Ltd. (TSXV: LA) (OTCQX: LSANF) (‘Los Andes’ or the ‘Company’) is pleased to announce the results of a positive Pre-Feasibility Study...